200MWh BESS at Net-Zero Campus in Texas Expected Online in 2024
Back to Newsroom SEPTEMBER 8, 2022 — A 200MWh battery energy storage system (BESS) from developer Available Power at a net-zero technology campus in Texas is expected to be online in mid-2024. The 100MW, two-hour system is being built on land leased from the GREENPORT International Airport and Technology Center near Austin, Texas. The lithium-ion…